Start with the building, not a catalog page

Project location, occupancy, wall assembly, exposure, height and design criteria define the useful product families. A stock frame that fits the width and height may still fail the project requirements.

Create one opening schedule

Every mark should connect to an elevation, quantity, width, height, operation, frame, glass, finish, hardware and surrounding condition. Keep revisions under the same opening ID.

Name the performance criteria

Structural, water, air, thermal, safety, acoustic, security and accessibility requirements must be stated before the product is treated as approved.

Carry logistics through the quote

Crating, delivery class, unloading, floor or elevation sequence, storage, lifting, access and installation scope belong beside the product price.

Turn the guide into a real opening schedule.

Keep every dimension, option, pressure, document, and delivery note connected to the same opening ID.

Start the configuration

Questions about this topic

Can a commercial window package be bought online?

The schedule and options can begin online. Fabrication and payment should wait until drawings, dimensions, product limits, pricing, freight and release documents are approved.