Define responsibility early
Assign removal, substrate repair, temporary protection, flashing, sealants, anchors, interior finish, exterior finish, equipment, testing and disposal before the quote is released.
Verify the opening and interface
Confirm dimensions, tolerances, frame depth, sill condition, membranes, adjacent materials, drainage, receptors and perimeter joint geometry.
Coordinate access and sequence
Plan delivery, unloading, hoisting, floor distribution, storage, occupied-area protection and weather exposure around the construction schedule.
Inspect and close out
Verify frame alignment, fasteners, seals, weeps, glass, hardware and operation. Retain labels, photos, test results, cleaning instructions and warranty records.
Turn the guide into a real opening schedule.
Keep every dimension, option, pressure, document, and delivery note connected to the same opening ID.
Start the configurationQuestions about this topic
Is installation included with every order?
No. Product-only and installed scopes are both possible. Coverage, access, equipment and field conditions must be confirmed by project.