Build the shipment around the site

Truck access, appointment rules, dock or curb delivery, crane or forklift availability, floor loading and storage limits affect the useful packaging plan.

Label for the field sequence

Crates and units should carry the same opening IDs used on elevations, schedules, shop drawings and installation tracking.

Protect glass and finishes

Establish handling, blocking, dry storage, edge protection and cleaning rules. Long-term exterior film exposure can damage finishes or become difficult to remove.

Record receipt and damage

Inspect packaging and visible units at delivery, note exceptions on the carrier record and document damage promptly with crate and opening IDs.

Turn the guide into a real opening schedule.

Keep every dimension, option, pressure, document, and delivery note connected to the same opening ID.

Start the configuration

Questions about this topic

Is shipping included in a displayed product price?

No. Commercial freight requires the final crate plan, weight, destination, access and delivery service before it can be confirmed.