Align drawings and schedules
Window marks, elevations, details and quantities must agree. Flag substitutions, alternates and delegated-design items directly.
Document the assembly
Identify frame series, depth, operation, glass, finish, hardware, anchors, receptors, subsills, panning and perimeter components.
Track performance evidence
Connect test reports, calculations, product approvals and engineering to the actual size, configuration and project criteria.
Control the approval record
Log comments, revisions, samples, color approvals and release status so manufacturing is based on one approved package.
Turn the guide into a real opening schedule.
Keep every dimension, option, pressure, document, and delivery note connected to the same opening ID.
Start the configurationQuestions about this topic
Can dimensions alone support a final release?
Usually not. The release should resolve system, glass, finish, hardware, performance, interfaces, documentation and logistics as well as size.
