Align drawings and schedules

Window marks, elevations, details and quantities must agree. Flag substitutions, alternates and delegated-design items directly.

Document the assembly

Identify frame series, depth, operation, glass, finish, hardware, anchors, receptors, subsills, panning and perimeter components.

Track performance evidence

Connect test reports, calculations, product approvals and engineering to the actual size, configuration and project criteria.

Control the approval record

Log comments, revisions, samples, color approvals and release status so manufacturing is based on one approved package.

Turn the guide into a real opening schedule.

Keep every dimension, option, pressure, document, and delivery note connected to the same opening ID.

Start the configuration

Questions about this topic

Can dimensions alone support a final release?

Usually not. The release should resolve system, glass, finish, hardware, performance, interfaces, documentation and logistics as well as size.