Commercial glazing collection

Commercial Fixed Windows Built Around the Project Schedule

Compare daylight, views and high-performance non-operable glazing. Every request is reviewed against the opening dimensions, wall condition, glass, finish, performance criteria, submittal requirements, freight and installation sequence.

Commercial Fixed Windows for a coordinated commercial building project

Compare before specifying

Compare window models and frame details

Compare operation, frame construction and published sightline details, then open the model page for configurations and technical resources. Final dimensions, glass, attachment and performance must be checked together for your project.

7 window models for project review
Model and specificationsOperationFrame constructionThermally brokenStile
All Aluminum Fixed Window (S.45)Fixed windowsAll Aluminum Fixed WindowNo1 ¹³⁄₁₆"
All Aluminum Thermally Broken Fixed Window (TS.77)Fixed windowsAll Aluminum Thermally Broken Fixed WindowYes1 ⅜"
All Aluminum Thermally Broken IMPACT Fixed Window (TIS.67)Fixed windowsAll Aluminum Thermally Broken IMPACT Fixed WindowYes2 ⅞"
Steel (M.40.FW)Fixed windowsSteelNo1 ¹⁄₁₆"
Steel Slim (MT.50.FW)Fixed windowsSteel SlimYes1 ¼"
Steel Slim Profile (M.20.FW)Fixed windowsSteel Slim ProfileNoConfirm with quote
Steel Thermally Broken Heavy Profile Fixed Window (MT.75.FW)Fixed windowsSteel Thermally Broken Heavy Profile Fixed WindowYesConfirm with quote

A thermal break describes frame construction. It does not by itself establish a whole-window U-factor, impact approval, acoustic rating or suitability for an opening.

Build an opening schedule

Give every opening an ID. Record three widths, three heights, both diagonals, wall depth and photos. Keep measured openings separate from approved manufacturing dimensions.

Document the existing condition

For replacement work, identify the existing frame, sash operation, trim, anchorage and whether the frame stays or comes out. This determines the installation detail and usable opening.

Confirm the complete quote

Match the model, finish, glass, quantity, installation scope and delivery requirements to the same schedule. Request the relevant drawings and performance documentation before approving fabrication.

Read the commercial window buying guide or send your opening requirements.

Windows in this collection

Choose the operation. Then fit it to the opening.

7 product families listed for project review.

Buying notes

What to resolve before fabrication

Send elevations, opening schedules and relevant details together.

State the required structural, water, air, thermal, acoustic and safety criteria.

Confirm samples, submittals, lead time, crating, receiving and field sequence before release.

Straight answers

Buying commercial fixed windows

Can commercial fixed windows be made to custom dimensions?

Yes, within the limits of the selected frame, glass, hardware and tested assembly. Enter the actual dimensions and identify whether they are frame, rough-opening or daylight dimensions.

Why is pricing quote-only?

Commercial window pricing depends on system, size, quantity, glass, finish, hardware, perimeter accessories, documentation, packaging, freight and project sequence. The quote keeps those facts attached to the correct opening.